Metrohm Thin-Layer cell Manual de usuario Pagina 15

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 29
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 14
■■■■■■■■■■■■■■■■■■■■■■
3 Installation
IC Equipment Thin-Layer cell
■■■■■■■■
9
3
Connect the cell output
Use a pressure screw (6.2744.014) to fasten a 1–1.5 m long piece of
the PEEK capillary (6.1831.010) to the Out connector on the measur-
ing cell.
Note
This capillary must be tested with the IC instrument the first time
the detector is put into operation, see Chapter "Start-up" in the
manual for the detector.
If the preheating capillary is not used, proceed as follows:
Connecting capillaries to the measuring cell
1
Connect the cell input
Use a pressure screw (6.2744.014) to fasten the detector input capil-
lary to the In connector on the measuring cell.
2
Connect the cell output
Use a pressure screw (6.2744.014) to fasten a 1–1.5 m long piece of
the PEEK capillary (6.1831.010) to the Out connector on the measur-
ing cell.
Note
This capillary must be tested with the IC instrument the first time
the detector is put into operation, see Chapter "Start-up" in the
manual for the detector.
Vista de pagina 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 28 29

Comentarios a estos manuales

Sin comentarios